Case Studies: Connecticut

Fairfield Wastewater Treatment Plant

Project Specs: Location: Fairfield Wastewater Treatment Plant Installer: Foundation Stabilizers Inc. Engineer: Stearns & Wheler, LLC Pile Specs: 342 Piles D10 (1.75” Round Corner Square) 8”, 10”, 12”, 14”, 14” Diameter Helices 34’ Average Depth Ultimate Loads: Compression: 80,000 Lbs. Tension: 80,000 Lbs. Image Source > Google Earth During the rehabilitation of the Town of  … Read more