Glen Head Water Filtration Building Case Study
November 29, 2021
Project Specs:
- Location: Glen Head, NY
- Certified Installer: FSR
- Engineer of Record (EOR): D&M Engineers & Architects
- Perimeter Helical Pile Specifications:
- 27 MacLean Power Systems (MPS) Helical Piles
- D7 (1.5” Round Corner Square) Leads w/ 10”, 12”, 14” Dia. Helices on a 7’ shaft & P28 (2.875” x 0.203” Pipe Shaft) Extensions
- Average Depth of Helical Piles: 14’
- Minimum Req’d Installation Torque of Perimeter Helical Piles: 4,800 ft-lbs - Interior Helical Pile Specifications:
- 28 MacLean Power Systems Helical Piles
- P35H (3.50” x 0.300” Pipe) Leads w/ 10”, 12”, 14” Dia. Helices on a 7’ shaft & P35H Pipe Shaft Extensions
- Average Depth of Helical Piles: 19’
- Minimum Req’d Installation Torque of Interior Helical Piles: 10,300 ft-lbs - Ultimate Load(s):
- Perimeter: 45 kips (Compression)
- Interior: 75 kips (Compression)
The hamlet of Glen Head hired D&M Engineers and Architects to design a new water filtration building for their residents. Due to the poor soil conditions on site, the EOR chose helical piles to support the foundation of this new water filtration building. FSR was contracted to install a total of 55 helical piles on site. Despite the large number of underground utilities in on site, FSR successfully installed all 55 MPS helical piles in only two working days.
Request Your Free Quote
"*" indicates required fields

Premium Technical Services
Commercial Services
Complete Basement Systems
Residential Services

Premium Foundation Supply
Distribution Products

